How long does it take for the design process?

The time frame will vary depending on many factors, such as size and complexity of the home, time of year, ability of the client to make design decisions, etc. Although some designs have happened faster, 6 weeks seems to be the minimum, with 8-10 weeks more typical.

Posted in: New Home Design

Posted in